Rumah Deret Purwomartani · Kalasan, Sleman · 2025 · Under construction

Send Brief
Tiga unit deret dalam tahap struktur lantai dua, difoto dari jalan perumahan pada siang hari dengan perancah masih terpasang.

Rumah Deret Purwomartani, Kalasan — upper floor structure, 8 July 2026. Photograph: studio supervision record.

House

Rumah Deret Purwomartani

Kalasan, Sleman, DIY · 2025

This project is under construction. Progress as of July 2026: the upper floor structure of all three units is complete, and wall and joinery work is in progress. The photographs on this page are dated construction photographs, not renderings.

The site and the problem

The developer asked for three units with identical plans so that material purchasing could be combined and the builders would not have to learn two layouts. The difficulty is that the middle plot has no open side at all — units sit against it left and right. An identical plan would produce one dark, airless unit, and that is the one that stays unsold longest.

Three plots of 8 by 20 metres each, with a six-metre estate road on the south side, a four-metre setback, and a two-storey height limit. None of those figures was the problem; the problem was the position of the middle unit.

The second constraint was budget. Small-scale developers count to the square metre, and any specification that has to be ordered specially will be struck out by them on site.

Gambar 01. The middle plot is closed on both sides. That is the only difference between the three plots, and it governs the whole design.
Geser untuk melihat seluruhnya

Massing study

Three alternatives were tested against one question: how does the middle unit get light and air without changing the structure that was made identical.

Alternative A— Ditolak

Rejected. Three fully identical units give the largest saving, but the middle one is dark all day and takes longest to sell.

Alternative B— Ditolak

Rejected. A gap between units gives side light, but it eats saleable area and adds two external walls per unit.

Alternative C— Terpilih

Selected. The middle unit is split by a void at the centre of the plan; the structure stays identical and the light comes from above.

Design decisions

  1. 01

    One base plan, three variants of opening

    Structure, stair position, pipe runs, and sanitary points are identical across all three units — that is where the saving is. What differs is only the position and size of the openings, according to which side is open.

    See drawing 10

  2. 02

    The middle unit gets a void and a skylight instead of side windows

    A void 1.6 metres wide cuts through the upper floor slab at the centre of the plan, closed with a skylight that has side vents. Light comes from above; warm air leaves through the sides of the skylight.

    The middle unit therefore has 8 m² less floor area than the other two, and its asking price was adjusted accordingly. That was discussed openly with the developer from concept stage.

    See drawing 06

  3. 03

    Specifications locked to what the local builders merchants stock

    Tile sizes, aluminium window sections, light-gauge steel profiles, and paint grades were all set from what is available within a ten-kilometre radius. The working drawings name dimensions and quality grades rather than a single brand, so the developer keeps room to negotiate without changing the design.

    See drawing 11

  4. 04

    The terrace is composed as one elevation, not as three houses in a row

    The eaves line runs continuously, but the front plane of each unit steps 40 cm in and out. From the road the terrace reads as one long building with a rhythm, not as three copies.

    See drawing 07

  5. 05

    The carport is sized for motorcycles first, cars second

    At this price point, two or three motorcycles are far more certain than one car. The carport is sized to take both without eating into the veranda.

    See drawing 04

Working drawings

Plans, sections, and details from the working drawing set for this project. Annotations inside the drawings stay in Indonesian: the people reading them are on site.

Gambar 04. Ground floor of all three units. Note the stair and sanitary positions: identical, and that is where the saving is.
Geser untuk melihat seluruhnya
Gambar 05. Upper floor. The void in the middle unit cuts the slab and is closed with a side-vented skylight.
Geser untuk melihat seluruhnya
Gambar 06. Section C-C through the middle unit. Light comes from above; warm air leaves through the sides of the skylight, not through windows that do not exist.
Geser untuk melihat seluruhnya
Gambar 07. South elevation. The eaves line runs continuously across all three units while the front planes step 40 cm in and out.
Geser untuk melihat seluruhnya
Gambar 08. Exploded axonometric. The slab opening in the middle unit is visible as the only difference in structure.
Geser untuk melihat seluruhnya
Gambar 09. Skylight detail. The exhaust opening is at the side rather than the top: rainwater must not enter along the air path.
Geser untuk melihat seluruhnya
Gambar 10. One base plan, three variants of opening. The dark areas mark the openings; everything else is identical across the three units.
Geser untuk melihat seluruhnya
Gambar 11. Extract from sheet A-142. The joinery schedule names dimensions and quality grades rather than a single brand, so the developer keeps room to negotiate.
Geser untuk melihat seluruhnya

Regulatory compliance

Regulatory compliance for Rumah Deret Purwomartani
ParameterProvisionUsed
KDB (building coverage)max 60% (96 m²)62 m² per unit
KLB (floor area ratio)max 1.20.61
KDH (green area)min 20%28%
GSB (front setback)4 m from plot boundary4 m
Heightmax 2 storeys2 storeys
PermitPBG for three units, filed togetherissued 2025, 6 weeks

The provisions applied to this site in this year. Provisions differ between areas and can change. The abbreviations are the Indonesian regulatory terms and are kept as they are.

Permit processing time

6 weeks, issued 2025

Processing time at the authority is outside the studio’s control. We record the actual time for each project so that you have a real picture rather than a promise.

Existing condition

Construction

Dated progress photographs, in chronological order.

We asked for three identical units to save money. They said it was possible, but the middle one would be hard to sell, and they explained why. In the end the middle unit got a void. That was the first one to sell.

Small-scale housing developer — Sleman

Credits

Client
A small-scale housing developer; their third project
Structural engineer
Independent practice, Yogyakarta
Quantity surveyor
Quantity surveyor, cost control
Contractor
Main contractor
Students on placement
Two architecture students, named on the sheets they drew

Have a plot with a similar problem? Send us a brief.

Send us the location, the plot area, and the rooms you need. We reply within two working days with an initial assessment — including if we think another practice would serve your project better.

We take on a maximum of six new design projects a year. Replies during working hours, Monday to Friday.