Reading a plot before you buy it: six things you can check yourself
Six checks you can make yourself in a single afternoon visit, before the deposit is paid.
Read in Indonesian
For clients
Working notes, not a blog. They cover technical problems from projects we are building or have just finished, plus a few pieces written for clients. A note may be as short as four hundred words if that is where it finishes.
The full text of this note is available in Indonesian only. The Indonesian version is linked from the language switcher.
Six checks you can make yourself in a single afternoon visit, before the deposit is paid.
Read in Indonesian
For clients
It began with a 2018 project whose west wall stayed damp, and the measurements we took ourselves afterwards.
Read in Indonesian
Field notes
Material dimension tolerances, mechanical routes invisible in old building drawings, and differences in workmanship between builders on the same task.
Read in Indonesian
Field notes
Written for clients, not for architects. What to prepare, when, and what has not changed.
Read in Indonesian
For clients
Joint treatment and water handling across three studio projects, with results after two to four rainy seasons.
Read in Indonesian
Field notes
Why the columns, starter bars, and second-floor service routes go in at the beginning, and why phase one must still feel finished.
Read in Indonesian
For clients
Send us the location, the plot area, and the rooms you need. We reply within two working days with an initial assessment — including if we think another practice would serve your project better.