Working notes, not a blog. They cover technical problems from projects we are building or have just finished, plus a few pieces written for clients. A note may be as short as four hundred words if that is where it finishes.

The full text of this note is available in Indonesian only. The Indonesian version is linked from the language switcher.

Reading a plot before you buy it: six things you can check yourself

Six checks you can make yourself in a single afternoon visit, before the deposit is paid.

Read in Indonesian

For clients

Why we no longer draw eaves shallower than 90 cm

It began with a 2018 project whose west wall stayed damp, and the measurements we took ourselves afterwards.

Read in Indonesian

Field notes

Three things almost always differ between the drawings and the site

Material dimension tolerances, mechanical routes invisible in old building drawings, and differences in workmanship between builders on the same task.

Read in Indonesian

Field notes

What changed from IMB to PBG for a homeowner

Written for clients, not for architects. What to prepare, when, and what has not changed.

Read in Indonesian

For clients

Exposed brick: three ways of laying it, three different results

Joint treatment and water handling across three studio projects, with results after two to four rainy seasons.

Read in Indonesian

Field notes

Incremental houses: drawing phase two during phase one

Why the columns, starter bars, and second-floor service routes go in at the beginning, and why phase one must still feel finished.

Read in Indonesian

For clients

Tell us about your site

Send us the location, the plot area, and the rooms you need. We reply within two working days with an initial assessment — including if we think another practice would serve your project better.