The site and the problem

The upper floor of a standard shophouse: deep, narrow, and glazed on one side only. The floor plate is 6 by 22 metres. The back of the space sits fourteen metres from the only source of daylight and had to use artificial light all day. The client refused to move because the location was right.

The clear height was only 2.5 metres beneath the suspended ceiling, with the third floor’s mechanical services running above it. This is interior work, but the problem is architectural: what had to change was the envelope and the slab of the building, not its furniture.

Gambar 01. The only glazed side is at the front. The figure 14.00 is the distance from that glazing to the deepest part of the space.
Geser untuk melihat seluruhnya

Massing study

Three alternatives were tested against one question: where could light reach the deepest part of the space from.

Alternative A— Ditolak

Rejected. Keeping the slab intact and adding more lighting is the cheapest option, and it is exactly what had already failed over the two years the client rented.

Alternative B— Terpilih

Selected. A 9 m² slab opening at the rear third cuts through to the roof and brings light to the deepest part.

Alternative C— Ditolak

Rejected. A long opening at the side would require demolishing a load-bearing wall belonging to the adjoining building.

Design decisions

  1. 01

    Nine square metres of slab were removed to make a void to the roof

    Not a decorative decision. The void sits exactly at the rear third of the space, cuts through to the roof, and is closed with a skylight.

    See drawing 10

  2. 02

    Steel sections frame the slab opening

    The structural engineer recalculated the load path back to the existing columns. This is what distinguishes interior work handled by an architect: the first question is whether the building may be cut into, not what colour to use.

    See drawing 09

  3. 03

    Partitions are 1.8 metres high and stop short of the ceiling

    So that air and light from the void reach the full depth of the space. Visual privacy is still obtained; air movement is not cut off.

    See drawing 07

  4. 04

    The suspended ceiling was removed and the services set out in the open

    The clear height was only 2.9 metres. Pipes, ducts, and cables were arranged on a single plane and painted one dark colour. The room gained 40 cm of height at no structural cost.

    See drawing 08

  5. 05

    Circulation runs straight from the stair to the void

    A single corridor with no turns, so that the deepest part of the space stays visually connected to the entrance.

    See drawing 06

Working drawings

Plans, sections, and details from the working drawing set for this project. Annotations inside the drawings stay in Indonesian: the people reading them are on site.

Gambar 05. Existing plan. Daylight reaches only six metres from the windows; the rest used artificial light all day.
Geser untuk melihat seluruhnya
Gambar 06. Plan after the work. Steel beams frame the slab opening and carry the load to the two nearest existing columns.
Geser untuk melihat seluruhnya
Gambar 07. Long section D-D. The 1.8 m partitions deliberately stop short of the ceiling: air and light pass above them.
Geser untuk melihat seluruhnya
Gambar 08. Exploded axonometric. What was removed and what was added are drawn as separate layers.
Geser untuk melihat seluruhnya
Gambar 09. Slab opening frame detail. Load from the frame goes to the existing columns, not to the slab that was cut.
Geser untuk melihat seluruhnya
Gambar 10. Daylight reach before and after the slab was opened. What is compared is the fabric of the building, not the decoration.
Geser untuk melihat seluruhnya
Gambar 11. Extract from sheet S-104, checked by the structural engineer. The arrows mark the direction of load transfer to the existing columns.
Geser untuk melihat seluruhnya

Regulatory compliance

Regulatory compliance for Kantor Sagan Lantai Dua
ParameterProvisionUsed
KDB (building coverage)unchangedunchanged
KLB (floor area ratio)unchangedreduced by 9 m² through the void
Slab demolitionstructural calculation required9 m², calculated by the engineer
Heightunchangedunchanged
Permitno new PBG requirednotification to the building management

The provisions applied to this site in this year. Provisions differ between areas and can change. The abbreviations are the Indonesian regulatory terms and are kept as they are.

Existing condition

Construction

Dated progress photographs, in chronological order.

Built

What changed on site

Once the ceiling came down, a water pipe run from the third floor appeared that did not exist on the original building drawings. It had to be diverted, and one partition moved 70 cm. The work took four extra days.

No project runs exactly as drawn.

Credits

Client
A twelve-person consultancy moving from a smaller rented space
Structural engineer
Independent practice, Yogyakarta
Contractor
Main contractor
Photographer
Studio photography collaborator

Planning a commercial building? Start with a brief feasibility study.

Send us the location, the plot area, and the rooms you need. We reply within two working days with an initial assessment — including if we think another practice would serve your project better.

We take on a maximum of six new design projects a year. Replies during working hours, Monday to Friday.