The site and the problem

A narrow plot, 9 by 20 metres, on a lane four metres wide, with houses on three sides. The governing problem was not appearance but smoke. A medium-capacity roasting machine needs a flue tall enough that its discharge does not fall into the neighbours’ yards, and it needs a safe distance from the openings of the house next door.

The second problem was regulatory: a three-metre setback from the front boundary on a plot nine metres wide immediately removes almost a fifth of the usable area. The height limit was two storeys, and the zoning had to be checked first because this was a commercial building.

Gambar 01. The two solid dots outside the boundary are the nearest openings of the neighbouring houses. The flue position was set against those, not against the elevation of the building.
Geser untuk melihat seluruhnya

Massing study

Four alternatives were tested against two things at once: where the smoke goes, and where the machine heat rises.

Alternative A— Ditolak

Rejected. Two full storeys give the largest area, but the cafe and the roasting area share one volume of air.

Alternative B— Ditolak

Rejected. A tall mass at the front closes off a four-metre lane and shades the house opposite all morning.

Alternative C— Terpilih

Selected. The upper floor sits only at the front, the roasting area at the rear is left double height with a void to the roof, and the flue goes on the north side.

Alternative D— Ditolak

Rejected. An upper floor at the rear blocks the path of the machine heat and forces the flue higher still.

Design decisions

  1. 01

    The flue is made a building element rather than hidden

    A steel flue rising six metres above the roasting floor is clad in brick and placed on the north side, against the stair. Its position was set after checking it against the two nearest openings of the neighbouring houses.

    See drawing 10

  2. 02

    The roasting area sits at the rear of the ground floor, with a void to the roof

    Heat from the machine rises through the void and leaves through the ridge vent. The cafe is at the front, so visitors can watch the roasting through glass without sharing its hot air.

    See drawing 07

  3. 03

    The mass is set back to the setback line, and what is left becomes a working terrace

    The mandatory three-metre setback was not left as motorcycle parking. It became a shallow-roofed terrace where coffee sacks are opened and sorted — work done every day that usually never gets a place of its own.

    See drawing 05

  4. 04

    The machine foundation is separated from the building foundation

    A roasting machine vibrates. The separation was required by the structural engineer, and it set the column positions across the whole ground floor.

    See drawing 11

  5. 05

    Every material was chosen from what is available in Yogyakarta

    Exposed brick, exposed concrete with plywood formwork, standard steel sections, and polished screed floors. Not one material had to be ordered from another city.

    See drawing 09

Working drawings

Plans, sections, and details from the working drawing set for this project. Annotations inside the drawings stay in Indonesian: the people reading them are on site.

Gambar 05. Ground floor. The machine foundation is drawn as a separate block — that is what sets every column position on this floor.
Geser untuk melihat seluruhnya
Gambar 06. Upper floor. It deliberately stops mid-span: the rest is void above the roasting area.
Geser untuk melihat seluruhnya
Gambar 07. Section A-A. Two separate exhaust paths: heat rises through the void to the ridge vent, smoke leaves through the flue.
Geser untuk melihat seluruhnya
Gambar 08. Exploded axonometric. The machine foundation is drawn as a layer of its own because it is genuinely a separate structure.
Geser untuk melihat seluruhnya
Gambar 09. Flue detail at the roof plane. The flashing rises 40 cm — on a building whose flue works every day, this is the point that leaks most often.
Geser untuk melihat seluruhnya
Gambar 10. Flue height against the neighbours’ openings, before and after the 80 cm increase. The dashed line is the smoke behaviour we found during the operating test.
Geser untuk melihat seluruhnya
Gambar 11. Separation of the machine foundation. The 20 cm gap is filled with a resilient material: machine vibration does not transfer to the building structure.
Geser untuk melihat seluruhnya
Gambar 12. Extract from sheet A-231. Revision R1 records the 80 cm increase as a result of the operating test, not as a design change.
Geser untuk melihat seluruhnya
Gambar 13. Sketch from the first meeting, when two hours went on where the smoke goes.
Geser untuk melihat seluruhnya

Regulatory compliance

Regulatory compliance for Sangrai Timoho
ParameterProvisionUsed
KDB (building coverage)max 70% (126 m²)118 m²
KLB (floor area ratio)max 2.01.14
KDH (green area)min 15%21%
GSB (front setback)3 m from plot boundary3 m
Heightmax 2 storeys2 storeys
PermitPBG, commercial buildingprocessed in 7 weeks

The provisions applied to this site in this year. Provisions differ between areas and can change. The abbreviations are the Indonesian regulatory terms and are kept as they are.

Permit processing time

7 weeks

Processing time at the authority is outside the studio’s control. We record the actual time for each project so that you have a real picture rather than a promise.

Existing condition

Construction

Dated progress photographs, in chronological order.

Built

The building in relation to the four-metre lane and the house opposite

What changed on site

The flue was raised 80 cm above the drawn height after the first operating test showed the smoke still falling when the wind came from the east. The change was completed before handover and recorded in the as-built drawings.

The glass between the cafe and the roasting area was changed from single to double glazing because the radiant heat was noticeable at the nearest table.

No project runs exactly as drawn.

What I remember is that our first meeting spent two hours on where the smoke goes. I thought architects only talked about appearances.

Coffee business owner — Yogyakarta

Credits

Client
A coffee business owner who had been renting a shophouse and wanted to move the roasting machine into a building of their own
Structural engineer
Independent practice, Yogyakarta
MEP engineer
Mechanical & electrical engineer
Contractor
Main contractor
Photographer
Studio photography collaborator

Planning a commercial building? Start with a brief feasibility study.

Send us the location, the plot area, and the rooms you need. We reply within two working days with an initial assessment — including if we think another practice would serve your project better.

We take on a maximum of six new design projects a year. Replies during working hours, Monday to Friday.